Plan Review/Project Submittal Requirements

All project submittals must be sent in electronic format to the Planning Department and provide the following documents:

  • Plan set of signed and sealed engineered drawings
  • Transmittal or cover sheet with contact information
  • Completed Utility Site Plan Checklist 
  • Payment for all applicable plan review fees -  determination will be made upon initial review if a hydraulic analysis is required.

* Please note that review may not commence until all documents are received and applicable fees are paid in full. To inquire on the status of project approval, please contact the Planning Department at (850) 233-5100. 

Impact Fees

All impact fees are processed through the Utility Engineering Division.

For questions regarding fees, please contact Chase Hakenewert at (850) 233-5100, ext. 6869.  Plans for impact fees calculations may be submitted to Water and Sewer Impact FeesPayment of impact fees can be paid through the Impact Fee Coordinator located on the second floor of the Public Services Building.

Inspections

Please contact our office at a minimum of 48 hours prior to the requested date and time of inspection. To follow up on the status of an inspection, please call (850) 233-5100, ext. 6888.

 *For fire hydrant flow testing, please contact the Fire Inspection Division at (850) 233-5100. ext. 6871. 

Construction and Permitting Forms

Utility Availability Request 2025

Commercial Meter Release Form

Hydraulic Analysis

Revenue Certificate Information 

Portable Hydrant Meter Application 2025

Customer Information for Low Pressure Sewer Systems

Minimum Technical Standards Checklist for Utility As-Builts 

Utility Site Plan Checklist with As-Built Checklist

Utility System Standards - PDF File

Utility System Standards - CAD File

PCB Seal for CAD file (dwg)

PCB Seal for CAD file (PDF)