Alf Coleman Road Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

Sunny Sidewalks Alf Coleman Road1

 

 

Construction on Alf Coleman Road started October 2023 and concluded September 2024. 

This safety and rehabilitation work is primarily funded by partner agencies: the Florida Department of Transportation (FDOT) and the Florida Department of Emergency Management (FDEM). The roadway and sidewalk portions of construction are 100 percent grant funded. The City paid for the design portion and received a $1.6 million grant from FDEM for drainage and utility improvements, resiliency, and raising the roadway. The remaining funds are from the FDOT’s safety funds for sidewalk and lighting improvements, and FDOT’s general highway funds for resurfacing, signalization and signage.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer